Showing posts with label Burlington. Show all posts
Showing posts with label Burlington. Show all posts

Thursday, February 6, 2014

Winter cycling blues

I'm not a die-hard winter cyclist and usually opt for warmer climes for winter cycling.  I don't mind few layers and cold weather but this relentless, never-ending snow is getting me down.

The Burlington Cycling Committee has been working hard behind the scenes for safer better cycling in Burlington.  They can't do it without you!

To get you ready for the cycling season, the Burlington cycling committee will be hosting 3 seminars at the Public and they're free but we need you there to make it worthwhile!

Wednesday, December 9, 2009

More exiciting than Rachael, Jamie, Holly, Joslyn etc, etc, showing up on Tiger's doorstep!

We'll be back at it again in Jan. as MTO promises us a design more exciting than all of Tiger's alleged showing up on his doorstep together.  A design that will meet our needs, making it safe and comfortable for vulnerable road users on Fairview at the QEW.

MTO is on the cusp of giving us bike lanes and even chartreuse coloured bike lanes on Fairview at the QEW.  However, they are hedging their bets on a sharp right turn lane that forces motorists to slow down on Fairview Street before entering a new on ramp to the QEW Niagara.

The sharp right turn works.  Since is was installed on the opposite side of Fairview, there have been no deaths or serious injuries in an eleven year span.  Contrast this with 2 deaths & 1 serious injury in 3 years under the old MTO standard.

Thursday, September 3, 2009

Groundhog Day Redux - again & again

What if they had a party & this time you weren't invited?

Cycling across the liftbridge today I noticed a bevy of white helmets marching in unison on the pier. Curiosity got the better of me. I interrupted my ride on a beautiful fall day to see what the fuss was about. To my surprise it was MP Mike Wallace & an entourage of PWGSC people with the ubiquitous media contingent.

While Mike talked to Jason, then CHCH, I passed time by talking to the PWGSC entourage at the liftbridge. Today, they announced the awarding of a ~$4 million contract to paint, scrape and rehabilitate the bridge. (2nd picture) Strangely, no one from either city was there. On March 09, it was standing room only, as Mike announced the bridge rehabilitation with media & municipal politicians from Hamilton & Burlington in attendance accompanied by senior city hall staffers. (top picture)

You learn a lot kibitzing with PWGSC. Pedestrians & cyclists shouldn't feel left out! PWGSC has come up with 5 options for making the bridge safer. This includes building a 2nd bridge, synced with the first and the scurrilous do nothing option. Mike Wallace added a few more options PWGSC didn't think of bringing the total to 9! Of course, it all depends on funding.

In the next week or two, Mike Wallace will invite cycling committees from Hamilton, Burlington & other stakeholders to a roundtable discussion to deliberate the merits of the various options.  Thanks Mike!  We'll look forward to the discussions.

Per PWGSC, its not the implementation that takes so long to get it done. Its the design & preparation before the work begins that takes time. A project such as the lakeside path would take 5 years!  Slow but true, given the bridge facelift announcement was originally posted in the Spec in Sept. 2008.


We've been told PWGSC is the obstacle behind getting a lakeside path. Not so, cried the woman from PWGSC! Its the funding. If we find a way to pay for it, PWGSC would be too happy to build it!

Isn't it time for that second round of stimulus funding?